The TMMIN Glossary is a collection of terms used directly or indirectly within TMMIN’s operations, along with their respective definitions.

TMMIN Terms

Glossary of Terms

Many terms at TMMIN come from the Toyota Production System. Choose a letter or search for a term to see what it means.

Select Letter

AB-Seigyo

A production control method used to manage and coordinate processes between A and B operations. The exact meaning of “AB” depends on the specific production system or plant terminology.

Andon

A visual signal on the production line that an operator triggers on finding a problem, so the line can stop and the problem is dealt with at once.

Ato-Kōtei

The next process or subsequent operation in a production line. In the Toyota Production System, each process supplies products or components that meet the quality and quantity requirements of the next process.

Ato-Kōtei Hikitori

A production and material supply approach in which the subsequent process takes only the parts or quantities it needs from the preceding process, helping prevent overproduction and maintain smooth production flow.

Baratsuki

Variation or inconsistency (mura and muri) in production processes, product quality, cycle time, or work methods that can affect production stability.

Chou-sei (Chōsei)

The process of adjusting or fine-tuning equipment, production conditions, or work processes to achieve the required specifications and stable operation.

Dai-Rotto (Dai-Rotto / Dai Lot)

A production method involving large quantities of products or components in a single production lot, typically requiring careful inventory and production flow management.

Dandori

The preparation and setup activities required before starting a production task, including changing tools, preparing materials, and adjusting equipment.

Dandori Time

The time required to prepare and set up equipment or processes for production, such as changing tools or adjusting machine settings between production runs.

Dojo

A training facility where employees learn and practise basic production skills before working on the line.

E-Kanban

An electronic system that communicates production and material replenishment signals between processes in real time, helping ensure that the required parts are supplied in the right quantity and at the right time.

Furyouhin-No-Muda

Waste caused by defective products, including the additional time, materials, and resources required for rework, repair, replacement, or disposal.

Gaichu-Kanban

A Kanban system used to communicate material or component requirements to external suppliers, supporting timely replenishment and production flow.

Genba (Gemba)

The actual workplace where value-creating activities take place, such as a factory production line or assembly area.

Genchi Genbutsu

“Go and see”: understanding a problem by going to where it happens (the genba) and seeing the facts first-hand.

Haiya Unpan

A material transportation method in which products are delivered according to the quantity required by the next process. The delivery operation then waits for the next instruction before making another delivery.

Hanare Kojima

A production line configuration in which a work process is isolated and cannot be efficiently combined with other workers’ processes to accommodate increases or decreases in production volume.

Hansei

Self-reflection: honestly reviewing what did not go well so it can be improved next time.

Heijunka

Levelling production, in both mix and volume, over a period to reduce waste and uneven workload.

Henka-ten (Henkaten)

A change point in the production process that requires attention and management when changes occur in the 4M factors: Man, Machine, Material, and Method, to maintain product quality and production stability.

Hikitori-Kanban

A Part-Withdrawal Kanban that indicates the timing and quantity of parts to be collected from a preceding process or ordered from a supplier. There are two types of Part-Withdrawal Kanban: Inter-Process Kanban and Supplier Kanban.

Hitozukuri

The process of developing people, often associated with Monozukuri (making products). Producing high-quality products requires the right skills, knowledge, and attitude, which can be developed through training, education, and mentoring from supervisors.

Hiyari-Hatto

A near-miss incident in which a potentially dangerous situation occurs but does not result in an accident or injury. Reporting these incidents helps prevent future accidents.

Hozen

Maintenance activities performed to preserve equipment condition, prevent breakdowns, and maintain safe and stable production operations.

Hyoujyun-Temochi

The standard minimum stock of parts or materials that should be kept at a workstation to repeat the work sequence efficiently and safely while minimizing material usage and excess inventory.

Ijyou

An abnormal condition or deviation from the established standard that requires attention and appropriate action to prevent defects or production disruptions.

Ikki-Nagashi

A production method in which only one part or product is assembled at a time and moved along the production line to the next process, supporting continuous flow and minimizing work-in-process inventory.

Inter-Process Kanban

A Kanban system used to signal the need to transfer parts or materials from one process to the next, helping maintain a smooth production flow.

Jasuto in Taimu

A production principle of producing and delivering only what is needed, when it is needed, and in the quantity needed to reduce waste and maintain an efficient production flow.

Jidoka

Automation with a human touch: a machine or operator stops the process as soon as something is abnormal, so defects are not passed on.

Jidouka

The principle of building quality into the process by enabling machines or operators to detect abnormalities and stop the process when necessary, preventing defects from being passed to the next process.

Jikkou-Takt-Time

The actual takt time used to guide production, based on the required production pace to meet customer demand within the available working time.

Jishuken

A self-directed improvement activity in which team members study their own work processes, identify problems, and implement improvements to increase work productivity, such as reducing cycle time, eliminating muda (waste), mura (unevenness), and muri (overburden), and reducing manpower requirements.

Jundate

A production preparation method in which parts or materials are arranged in the required sequence to support smooth and efficient assembly.

Junjobiki Unpan

A parts transportation method in which components are collected and delivered in the required production sequence to support assembly and reduce searching, sorting, and excess inventory at the workstation.

Just In Time

Making only what is needed, when it is needed, in the amount needed. One of the two pillars of the Toyota Production System.

Jyunbiki

A parts-supply method in which components are pulled or prepared according to the required production sequence, helping ensure that the right parts are available at the right time.

Kadouritsu

The operating rate that indicates the actual production level achieved by a process. It represents the percentage of total production capacity utilized during regular working hours, based on customer demand. This rate fluctuates depending on sales volume and is used to assess process efficiency.

Kaizen

Continuous improvement: small, ongoing changes made by everyone to improve how work is done.

Kajyu Heiki

The average production load that indicates the number of units Toyota is required to produce within a specified period during one shift, based on the production plan.

Kako-No-Muda

Waste identified in past activities or processes that can be used as a reference to prevent recurrence and support continuous improvement.

Kanban

A card or signal that tells the previous process what to produce or deliver, and how much.

Kanban System (Kanban Hōshiki)

Kanban is a tool used in the Toyota Production System to operate production as a pull system. It facilitates information flow between processes and automatically triggers orders for replacement parts when items are used. Each item or box of items moving through the production process carries its own Kanban. When the items are used or transported, the Kanban is removed and returned to the preceding process as a signal to replenish the items.

Kiken-Yochi-Training

A safety training method in which workers identify potential hazards in a work situation, anticipate possible accidents, and determine preventive actions before starting work.

Kotei

A production process or production line that covers the stages from processing raw materials to producing a finished product. It refers to the overall sequence of operations carried out on the genba (production floor) to manufacture a product.

Kotei Kanri

Process control and management that monitors production activities to ensure each process follows the established standards and achieves the required quality, delivery, and productivity targets.

Kotei no Nagareka

Continuous Process Flow is one of the three basic requirements of Just-in-Time. Its purpose is to eliminate stagnation within and between work processes by ensuring a smooth production flow, with products processed one piece at a time.

Koteinai-Kanban

A Kanban used within a production process to control the movement or replenishment of parts and materials between workstations according to production needs.

Mae-Kotei

The preceding process in a production sequence that supplies parts or materials to the next process.

Mashin Saikuru Taimu

Machine Cycle Time is the total time required for a machine to complete one full operating cycle, from the start of an operation until it is ready to begin the next cycle.

Mieru-ka

Visual Management is the practice of making work conditions, production status, problems, and performance easily visible so that abnormalities can be identified and addressed promptly.

Mizu-Mashi Unpan

A parts-pulling and transportation method that verifies the established production sequence and pulls the required types and quantities of parts from the preceding process according to a predetermined sequence. Its purpose is to synchronize the output of the preceding process with the needs of the next process by determining the appropriate part types and quantities while considering transportation efficiency, lead time, and manpower requirements.

Monozukuri

Monozukuri, or making things, is not just about manufacturing a product. It involves thinking holistically about how to add value to a product and generating innovative ideas to improve the way it is made. Continuous innovation helps improve product quality and the manufacturing process.

Muda

Waste: any activity that adds no value for the customer, such as waiting, unnecessary movement or excess stock.

Mura

Unevenness in workload or flow, often the cause of muda and muri.

Muri

Overburden on people or machines beyond their reasonable capacity.

Nagareka

Refers to establishing a continuous production flow by producing one item at a time, or in small but consistent quantities, through a series of processes in accordance with takt time. Production is aligned with the quantity and timing required by the next process to minimize stagnation and work-in-process inventory.

Nemawashi

Building agreement before a decision is made, by discussing a proposal with everyone concerned first.

Noritsugi Unpan

A transportation method that separates truck driving from loading and unloading activities. After delivering a loaded truck to its destination, the driver switches to another truck that is ready for delivery, allowing transportation operations to resume promptly and reducing vehicle waiting time.

Poka-Yoke

A device or method that prevents a mistake from happening, or makes it obvious as soon as it does.

Sagyou-Hyoujun

Work Standards define the standardized methods and requirements for each work process to ensure safety, quality, and productivity.

Saikuru Taimu

Cycle Time is the actual time required for an operator to complete one work cycle according to the prescribed work sequence.

Seiketsu

Seiketsu is the practice of maintaining and standardizing the conditions established through the first three S activities: Seiri, Seiton, and Seiso. It helps ensure that workplace organization and cleanliness are consistently maintained.

Seiri

Seiri is the practice of separating necessary items from unnecessary ones and removing items that are not needed in the workplace.

Seiso

Seiso is the practice of regularly cleaning equipment, tools, and the workplace to maintain proper functionality and safety. At a higher level, it also involves preventing the generation of dirt and waste.

Seiton

Seiton is the practice of organizing and arranging necessary items in designated locations, with clear labels or visual indicators such as item names, minimum and maximum quantities, and responsible persons, so they can be easily found and used.

Shiji-Bira

A Specification Manifest is an instruction sheet that identifies the type and specifications of parts to be installed in each vehicle being produced.

Shikake Kanban

A Production Instruction Kanban used to trigger production at a designated workstation or process. It provides instructions on what and how much to produce. The two types of Production Instruction Kanban are Intra-Process Kanban and Signal Kanban.

Shingo-Kanban

Signal Kanban is used in production processes that handle multiple product types on the same line and require significant setup time when changing production types or lots. Examples include pressing, die casting, and plastic injection processes. It signals when a new production lot should be started.

Shisa-Kosho

Pointing and Calling is a safety practice in which workers point at an object or condition, look at it, and verbally confirm its status by saying “Yosh” (all clear). This helps improve awareness and prevent errors and workplace accidents.

Shitsuke

Shitsuke is the practice of consistently following 5S activities and making them part of daily work habits. It also supports people development by building discipline and a continuous improvement mindset.

Shiwake

The activity of separating and classifying items according to their types, destinations, divisions, or other specified criteria.

Shojin

An improvement approach that reduces the workload or labor required for a task through work-method improvements or equipment enhancements while maintaining safety and quality.

Shoujinka

Flexible Manpower Allocation is an approach to managing production processes so that the number of operators can be adjusted according to changes in demand while maintaining production efficiency.

Soto Dandori

External Setup refers to preparation and cleanup activities that can be performed while the machine or production line is still operating, without interrupting production. These activities include preparing tools and materials before setup and organizing equipment after use.

Standardized Production Capacity Sheet

The Standardized Production Capacity Sheet (SPCS) shows the production capacity of each process when processing a part. It records manual work time, automatic machine processing time, and tool change time. It is used for machine-based processes to assess each machine's capacity in the production sequence. The machine with the lowest production capacity during regular working time becomes the bottleneck process and should be identified at the genba (production floor).

Standardized Work Combination Table

The Standardized Work Combination Table (SWCT) shows the sequence and timing of each work element, clarifies work duration and the scope of tasks to be completed within takt time, and visualizes the potential for combining manual work and machine operations.

Standardized Work Table

The Standardized Work Table (SWT) is a visual control tool that displays the layout and work areas assigned to each operator. In addition to the three elements of standardized work—Takt Time, Work Sequence, and Standard In-Process Stock—it includes quality checks, safety points, and other relevant information. It is displayed at the workplace to help supervisors observe and verify work practices.

STOP 6

STOP 6 is a safety classification system that groups potential accident hazards into six categories: Apparatus (being caught or trapped), Big Heavy (being struck by or crushed by heavy objects), Car (vehicle collisions), Drop (falls), Electric and Ergonomic (electrical hazards and ergonomic risks), and Fire (fire or hot objects). It helps workers identify hazards and take preventive measures.

Syou-Rotto

Small Lot refers to a production approach in which products are manufactured in small quantities per lot. This helps reduce work-in-process inventory, shorten lead time, and improve responsiveness to changes in demand.

Ta-kai Unpan

High-Frequency Transportation is a delivery method in which transportation frequency increases as the demand for parts increases. This approach helps minimize inventory at both the preceding and subsequent processes by delivering parts more frequently according to production needs.

Takt Time

The time available to make one unit to match customer demand: available working time divided by demand.

Takuto-Time

Takt Time is the available regular production time divided by the quantity of products required by the customer. It determines the pace at which a product must be completed to meet customer demand.

Tanoko-ka

Multi-Skilled Operator is an approach in which one operator is trained to operate multiple machines and perform various tasks within a work area. This increases flexibility, supports continuous production flow, and improves operational efficiency.

Teiichi-Teishi-Hoshiki

Fixed-Position Stop System is a mechanism used on a conveyor production line in which the conveyor continues operating until it reaches a predetermined stopping position after an abnormality is detected, such as a work delay or quality issue. This allows the line to stop at a designated position for appropriate handling.

Teiji-Futeiryo-Unpan

Scheduled, Variable-Quantity Transportation is a transportation method in which deliveries are made according to a predetermined schedule, while the quantity transported may vary depending on operational needs. It is useful when work areas are far apart and a fixed transportation schedule helps simplify operations.

Teiryo-Futeiji-Unpan

Fixed-Quantity, On-Demand Transportation is a transportation method in which the preceding process delivers a predetermined quantity of parts when the amount consumed by the next process reaches a specified threshold. The delivery time varies according to actual consumption and replenishment needs.

Temachi

Waiting refers to a condition in which an operator is unable to proceed with the next task and must wait, for example, for a machine cycle to finish, equipment to be repaired, or parts to be delivered.

Temachi-No-Muda

Waiting Waste occurs when workers are unable to start or continue their tasks because required parts, materials, tools, or instructions are unavailable or incomplete. This waiting time wastes labor and available production time without adding value.

Toyota Production System (TPS)

Toyota’s production system, resting on two pillars, Just In Time and Jidoka, to deliver the best quality with as little waste as possible.

Toyota Way

Toyota’s values and way of working, resting on two pillars: Continuous Improvement and Respect for People.

Tsukuri-Sugi-No-Muda

Overproduction Waste occurs when more products are produced than are needed, or products are made earlier than required. This creates excess inventory and additional costs. If production plans change, the excess stock may no longer be needed, resulting in further waste.

Uchi Dandori

Internal Setup refers to setup activities that can only be performed when a machine or production line is stopped because the work must be carried out within the machine or line. Examples include changing dies, cutting tools, and jigs.

Ugoki

Movement refers to the physical motions of operators or machines during work. In production, movements that do not contribute to value creation may be identified as waste and targeted for improvement.

Ugoki-No-Muda

Motion Waste refers to unnecessary movements made by operators during production that do not add value to the product. Examples include excessive reaching, walking, searching for tools, or repeatedly repositioning parts. Identifying and reducing these movements helps improve work efficiency, ergonomics, and productivity.

Umpan-No-Muda

Transportation Waste refers to the unnecessary movement or transfer of parts and materials between processes. Although transportation is necessary to support production, it does not directly add value to the product. Therefore, unnecessary transportation should be reduced by improving delivery routes, distances, and handling methods.

Work Sequence

The prescribed order of work elements that enables operators to perform tasks safely, effectively, and efficiently while maintaining a consistent production process.

Yamazumi-Hyou

A visual chart that displays the workload at each workstation, making it easier to review and analyze workload distribution. It is used to balance work across workstations, identify workload imbalances, and optimize work allocation.

Yokoten

Sharing a good practice sideways to other sections or plants, so an improvement made in one place is applied elsewhere.

Yosedome

A work simplification approach that streamlines and reallocates production equipment to use available workspace more effectively and improve production efficiency.

Youso-Sagyou-Hyou

An Element Instruction Sheet (EIS) that describes the procedures for each work element required to complete a part or a specific portion of an assembly. It includes key safety and quality points, work illustrations, the sequence of work elements, and the time required for each element.

Zaiko-No-Muda

Inventory Waste: Excess stock of raw materials, work-in-process items, or finished products that accumulates due to production or transportation processes. Excess inventory ties up space and resources, increases costs, and may conceal other production problems.

5S

Five steps for an orderly workplace: Seiri (sort), Seiton (set in order), Seiso (shine), Seiketsu (standardise) and Shitsuke (sustain).